沃卡河一级水电站是国家 62项援藏工程之一 ,工程总投资 84969万元 ;1 996年开始施工准备及工程建设 ,至 1 999年 1 0月 4台机组已全部移交生产单位试生产 ,计划在 2 0 0 0年 1 0月前全部建成。在该电站的建设过程中 ,通过借鉴以往工程施工经验 ,加强管理 ,不断探索和完善各项施工措施 ,确保了工程施工质量。该电站的投产为拉泽电力系统提供了急需的电力 ,并对缓解山南地区缺电及促进西藏经济发展等具有显著的经济效益和社会效益。
The WWII Hydropower Station is one of 62 projects supported by Tibet, with a total investment of 849.69 million yuan. Construction preparation and construction commenced in 1996. By January 1999, all four units had been handed over to production units for trial production It is planned to be completed by January 10 of 2000. In the process of building this power station, we constantly explore and improve various construction measures by drawing on the experience of past construction projects and strengthening management to ensure the construction quality. The commissioning of this power station has provided much-needed power for the Razer power system and has significant economic and social benefits for alleviating the power shortage in Shannan and for promoting the economic development of Tibet.