论文部分内容阅读
随着我国铁路事业的不断发展,铁路运输能力的不断提高,它对铁路施工队伍的管理水平,施工工艺的要求也是越来越高。做为铁路建设的我们将面临更加严峻的考验,新形势下不但要求我们具有一流的管理水平,精锐的施工队伍,先进的施工机械,高端的施工仪器;还要求我们在面对任何复杂的施工情况和地理环境下,根据施工现场实际情况,运用先进的技术和方法在最短的时间内,保质保量的完成施工生产任务,减少对铁路运输的干扰,更好的为铁路建设和运输生产服务。
With the continuous development of China’s railway undertakings and the continual improvement of railway transport capacity, the requirements on the management level and construction technology of railway construction teams are also getting higher and higher. As railway construction we will face more severe test, under the new situation not only requires us to have first-class management level, elite construction team, advanced construction machinery, high-end construction equipment; also requires us to face any complex construction Conditions and geographical environment, according to the actual situation at the construction site, the use of advanced technology and methods in the shortest possible time, the quality and quantity to complete the construction and production tasks to reduce the interference of railway transport and better service for the railway construction and transportation production .