论文部分内容阅读
游泳馆是国家级综合游泳比赛馆。它由比赛馆、训练馆和室外游泳场三部分组成。比赛馆是第一期工程。建筑面积37500平方米,观众厅观众总数为6000人。训练馆和室外游泳场是亚运会以后的第二期工程。全部建成以后,这里将是我国规模最大、设施最完整的综合游泳基地。 一、建设三结合综合游泳馆 现有的国内游泳馆在不同程度上都存在使用率低、经济效益和社会效益差等问题。
The swimming pool is a national-level integrated swimming competition hall. It consists of a competition hall, a training hall and an outdoor swimming pool. The competition hall is the first phase of the project. The building area is 37,500 square meters, and the audience of the audience hall is 6,000. The training hall and outdoor swimming pool are the second phase after the Asian Games. After it is completed, it will be the largest comprehensive swimming facility in China. I. Construction of a three-combined integrated swimming pool The existing domestic swimming pools have problems with low utilization rates, poor economic returns, and poor social benefits.