论文部分内容阅读
<正>In order to settle the mining optimization design and safety problem of the above 1 150 m pillar of No.1 ore-body in No.Ⅱ Mining Jinchuan, the lean-ore above 1 250 m, the 1 150 m horizontal pillar and the ore-body below 1 100 m regarded as resear