论文部分内容阅读
在全国范围内出现了一个风起云涌的建设小高炉的全民运动。全国将在一年内建立起上万个容积从3~255立方公尺的大中小高炉,生产能力将要超过2,000万吨,相当1000立方公尺高炉40座。最近,全国地方冶金工业会议向各省提出:“要继续发动群众开展一个10000座中小型高炉,200座小转炉,2000座小铜炉的建设运动”。目前,河北省已开展一个建设1000座小高炉运动。河南省今年要建成1000余座小高炉,还提出要建设3000多座小高炉的宏伟计划;信阳专区利用风箱、泥炉炼铁,这给乡乡社社都可以办炼铁厂,提出了好办法。山东省60多个有铁矿的县、市,将要在今
A nationwide surge in the construction of a small blast furnace for the national movement. The country will set up tens of thousands of large, middle and small blast furnaces with a capacity of 3 to 255 cubic meters in a year. The production capacity will exceed 20 million tons and 40 will be equivalent to 1,000 cubic meters of blast furnaces. Recently, the National Conference on Metallurgical Industry proposed to all provinces: “We must continue to mobilize the masses to carry out the construction campaign of a 10,000 small and medium-sized blast furnace, 200 small converter and 2000 small copper furnaces.” At present, Hebei Province has started a campaign to build 1000 small blast furnaces. Henan Province to build more than 1,000 small blast furnace this year, also proposed to build more than 3,000 small blast furnace grand plan; Xinyang Prefecture use bellows, mud furnace ironmaking, which township community can do ironworks, made a good Method. Over 60 counties and cities with iron ore in Shandong Province will be present