论文部分内容阅读
铁路建设项目具有较强的战略性和区域经济拉动作用,一直以来广为人们所关注。但由于其项目环境复杂、工程量大,风险性也大大增加。为了实现减小项目风险损失和保障项目建设的目的,结合实际项目经验,基于信息缺口的基本原理,对铁路建设项目风险预警系统的内涵进行分析,并在此基础上就该系统的构成和运行机制开展了探讨,最终建立了一个由项目风险预警分析子系统和项目风险预警管理子系统组成的风险预警系统,以期为铁路建设项目的风险管理提供借鉴。
The railway construction project has a strong strategic and regional economic stimulating effect and has been widely concerned by people all the time. However, due to the complicated project environment and large project volume, the risk is also greatly increased. In order to reduce the loss of project risk and protect the construction of the project, combined with the actual project experience, based on the basic principle of information gap, the connotation of railway construction project risk early warning system is analyzed, and on this basis, the composition and operation of the system Mechanism, and finally set up a risk early-warning system consisting of a project risk early warning analysis subsystem and a project risk early warning management subsystem in order to provide reference for the risk management of railway construction projects.