论文部分内容阅读
我矿有两条单线架空索道,横跨山谷,上连两个粗选工段,下接一个重选工段,担负着选矿车间粗选工段粗碎后的矿石的运输任务。索道本身是电力驱动,装卸却是人工作业,劳动强度大,生产不够安全,投产后一直是个薄弱环节。在毛主席革命路线指引下,在“工业学大庆”的群众运动中,选矿职工认真贯彻“鞍钢宪法”,破除迷信,解放思想,在党的领导下,集中群众智慧,自己设计,自己制造,经过一年多的试验和改进,终于在1966年实现了索道的装卸
My mine has two single-line aerial tramways, across the valley, even the two roughing section, under a re-election section, responsible for the roughing section of the beneficiation plant coarse crushing ore transportation tasks. Cableway itself is driven by electricity, handling is manual operation, labor intensity, production is not safe enough, put into operation has always been a weak link. Under the guidance of Chairman Mao’s revolutionary line and in the mass movement of “Daqing Industrial University,” beneficiation workers conscientiously implemented the Anshan Iron and Steel Constitution, breaking superstitions and emancipating their minds, and under the leadership of the party, they concentrated their wisdom, designed their own, After more than a year of testing and improvement, the cableway was finally loaded and unloaded in 1966