论文部分内容阅读
二滩水电厂位于四川省攀枝花市境内金沙江的最大支流——雅砻江下游,是雅砻江流域梯级电厂中的一级,电厂的主要用途是调频、调峰。整个电厂总装机容量为6×550MW,年发电量170亿 kWh,首台机组于1998年8月18日正式投产发电,其余机组于1999年12月4日全部竣工发电。其中6台励磁系统装置全部引进加拿大通用电气公司(CGE)生产的
Ertan Hydroelectric Power Plant is located in the lower reaches of Yalong River, the largest tributary of the Jinsha River in Panzhihua City, Sichuan Province. It is a first-class power plant in the Yalong River cascade. The main purpose of the power plant is frequency modulation and peak regulation. The entire power plant with a total installed capacity of 6 × 550MW, annual generating capacity of 17 billion kWh, the first unit on August 18, 1998 formally put into operation, the remaining units on December 4, 1999 all completed and power generation. Six of these excitation system devices were all imported from General Electric Company of Canada (CGE)