建筑施工阶段的工程造价的控制与管理

来源 :建筑知识 | 被引量 : 0次 | 上传用户:dongmeizi1988
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
工程造价的控制与管理贯彻在建筑工程施工的整个过程中,尤其现在我国工程项目的投资主体表现出一种多元化和多样化的趋势。建筑施工阶段的工程造价的控制与管理,直接关系到工程的成本和施工质量。本文主要通过分析我国建筑施工阶段工程造价控制与管理现状,探讨建筑工程施工阶段的造价控制和管理措施,旨在为施工工程项目管理提供参考。 The control and management of project cost is carried out throughout the construction process of the construction project. In particular, the investment subject of China’s engineering project shows a trend of diversification and diversification. The control and management of the project cost during the construction phase of the project is directly related to the cost and construction quality of the project. This article mainly analyzes the status quo of construction cost control and management in China’s construction stage, discusses the cost control and management measures in the construction phase of the construction project, and aims to provide reference for the construction project management.
其他文献
记者 :最近几年 ,看到您在《中国社会科学》、《哲学动态》等刊物上发表的一些文章 ,内容大多集中在“交往实践观”问题上 ,已引起学术界的较大反响。请您谈一谈为什么对交往
1.什么叫沼气综合利用?沼气综合利用,是指将沼气、沼液、沼渣(简称“三沼”)运用到生产的过程,是农村沼气建设中降低生产成本,提高经济效益的一系列综合技术措施。其范围涉
<正>项目名称:上海黄浦江东岸开放空间贯通概念规划业主:东岸集团设计单位:HASSELL设计有限公司项目地点:上海项目类型:城市设计,景观设计设计时间:2016年设计团队:Jon Hazel
BIM技术在建筑机电工程造价上的运用就是以机电设计师完成的三维模型为项目信息载体,通过可视化方式实现建筑机电造价管理的实时与动态调整,可更加高效、准确、快速获得各类
一“时刻准备着!……”——没有想到,这竟是我听到陈涌老的最后一句“戏言”和“预言”;对我来说,这就是他的“遗言”或“遗训”。2013年12月27日,李正忠、陈飞龙、祝东力、
《暴风骤雨》的文本透露着《被开垦的处女地》的影子,具有文艺理论的互文研究价值。它采用了外来者进入的叙述模式,如实地写出了土改过程的艰难与曲折。作者主要塑造了两种处
截止2004年底,安徽省5200万农村人口中,饮用水水质不达标的人口达1337.1万;其中氟超标的有435.6万人,主要集中在淮北地区的宿州、淮北、亳州、阜阳以及淮南凤台县;砷超标的19
近三十多年来,拜学术活动之赐,得以结识海内外众多著名作家、学者,有的还成为彼此念念不忘的朋友,台湾诗坛“三驾马车”即是。在当代台湾文坛,由洛夫、张默、痖弦创办于1954
局长在台上讲话,不到十分钟,台下便开始不安宁了。有人说悄悄话,有人按手机,有人打瞌睡,只有小王端坐在那里,认真地做着笔记。散会后,局长意味深长地拍拍小王的肩膀,目光中充
期刊
近年来,我国农村沼气建设呈现了稳步发展的趋势,日益体现出其明显的经济效益、环境效益和社会效益,尤其是以沼气为纽带的综合利用技术在促进农民脱贫致富、农村两个精神文明