1997年,我省按照“九五”期间重点工程建设实行“统筹规划、合理布局、突出重点、量力而行、注重效益”的方针,在资金适度紧缩的情况下稳中求进,集中力量保重点,继续抓紧美兰机场、昌江水泥厂、高速公路、通信、水利、农业和基础工业等项目建设。全年共安排重点建设项目41个,其中在建项目20个(基础设施项目11个,工业项目7个,农业项目2个),预备项目21个(基础设施项目7个,工业项目12个,农业项目2个)。一年来,全省重点工程建设平稳扎实,全年完成投资34.3584亿元,与全年计划持平。建设情况竣工投产项目如期完成,形成新的经济增长点;在建项目施工进度加快,工程质量良好;预备项目前期工作陆续展开,基础扎实,运作规范。1.年内四个项目竣工投产。我省第一条自筹资金、自行勘察设计、自行施工的西线高速公路海口至洋浦段3月29日正式通车,新增通车里程90公里;亚洲太平洋酿酒厂4月8日建成试生产、5月19日正式投产,年新增6.5万吨虎牌、力加等国际品牌
In 1997, our province followed the principle of “consolidated planning, rational distribution, highlighting key points, and focusing on efficiency, and focusing on efficiency” in accordance with the key projects during the “Ninth Five-Year Plan” period, and made steady progress in the event of moderate capital tightening. , Concentrate on protecting key points, and continue to seize the construction of Meilan Airport, Changjiang Cement Plant, highways, communications, water conservancy, agriculture and basic industries. In the year, a total of 41 key construction projects were planned, including 20 projects under construction (11 infrastructure projects, 7 industrial projects, and 2 agricultural projects) and 21 preliminary projects (7 infrastructure projects and 12 industrial projects). Agricultural project 2). In the past year, the province’s key projects have been building steadily and the investment for the year has reached 3.3493 trillion yuan, which is in line with the full-year plan. The completion of the construction project was completed on schedule and a new economic growth point was formed; the construction progress of the project under construction was accelerated and the project quality was good; the preliminary work of the preparatory project was launched one after another with a solid foundation and standardized operation. 1. Four projects were completed and put into production during the year. The first Haikou-Yangpu section of the Western Line Expressway, which is self-funded, self-surveyed and designed, and self-built, is officially opened to traffic on March 29, and the new traffic mileage is 90 kilometers. The Asia-Pacific Winery completed trial production on April 8. , officially put into operation on May 19, adding 65,000 tons of Tiger, Lijia and other international brands