埃及阿斯旺高坝的运动情况

来源 :东北水利水电 | 被引量 : 0次 | 上传用户:baishe654
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
阿斯旺高坝位于埃及尼罗河上,设计总库容1620亿立方米、水库防洪标准为千年一迂洪水设计,万年一迂洪水校核,是一座灌溉、发电、防洪、航运、渔业及旅游等综合利用的水库。枢纽工程包括拦河坝一座,坝型为粘土心墙坝,最大坝高111米,坝顶高程196米;泄洪、发电、导流三结合隧洞6条,内径15米,长度315米;水电站厂房长276米,宽46米,装机12台,单机容量17.5万千瓦, The Aswan high dam is located on the Nile in Egypt with a total design capacity of 162 billion cubic meters. The flood control standard for the reservoir is a thousand-year flood design and a year-long flood check. It is an irrigation, power generation, flood control, shipping, fishery and tourism Comprehensive utilization of the reservoir. The hub project includes a dam, the dam type of clay core wall dam, the maximum dam height of 111 meters, crest elevation of 196 meters; flood discharge, power generation, diversion three combined tunnel 6, diameter 15 meters, length 315 meters; Meters, 46 meters wide, installed 12 units, stand-alone capacity of 175,000 kilowatts,
其他文献
1.4号机于1972年12月投产发电。1974年预防性试验时(运行小时数为8077小时),测试中发现B相在2.0U_H直流耐压及泄漏电流,其泄漏电流达100微安。经查找未找出故障点仍投入运行
为实现职业技术学院晋升本科的目标,必须在现有发展的基础上,进一步加强专业建设,提高教育教学质量,深化校企合作,提高科研水平,打造行业的领军人物。 In order to achieve
对传统的电容-电压(C-V)、电流-电压(I-V)测量方法和我们自建的表征方法测量得到的蓝光发光二极管(LED)正向特性的结果做了详细的对比分析,发现传统测量方法得到的电学参量是不够精
BACKGROUND: Many methods are adopted in treatment of cavernous hemangioma, but those located at function site or large, extensive without capsule are still dif
南垭河水量丰沛、落差大而集中,可开发的水能资源是四川龙溪河的5.4倍,贵州猫跳河的3.3倍、云南以礼河的2倍。南垭河六个梯级电站均属中型,是四川省近期开发条件最好的一批中
应用泛函的变域变分工具,本文系统地建立了混流式叶轮机 S_2流面 H_A 型和 H_B 型杂交命题的变分原理族。本文目的有二:一方面提出一些合理设计叶轮机内外机壳型线的新途径,
一、前言 在现场测定岩体结构面、混凝土与基岩之间的抗剪强度及岩体变形性质,是岩石力学与工程重要内容之一。现场试验与室内试验相比,现场试验环境条件恶劣,往往处于试验场
一、渗透水流对水工建筑物的破坏作用 对于水工建筑物来说,自然的破坏力是一种经常存在的因素。威胁着水工建筑物安全的自然因素很多,最主要是水文、水力和地质条件。在水力
一、引言近年来,搭载着三维激光技术的产品如雨后春笋般涌现,如国外的Faro地面三维激光扫描仪、国内的LS300地面三维激光扫描仪和iScan移动三维激光测量系统等,其在推动着地
水是人类赖以生活和一切生产活动的不可缺少而又无可代替的物质基础.对一个国家或地区的盛衰兴替,水更是最为宝贵而有限的基本自然资源和保证条件.水也是生态环境平衡的最基