火电厂主厂房一般均采用整榀预制,每段重60t 左右。由于施工验算忽略了构件与胎模的粘结力和真空吸附力的影响,因而框架横梁出现出池起吊裂纹。本文在分析装配式钢筋混凝土结构裂纹产生原因的基础上,提出了合理吊点位置和减小吸附力等措施,并对清镇电厂三期扩建工程现场采取预应力复合结构补强方案进行论析。
The main powerhouses of thermal power plants generally use prefabricated prefabricated units, each weighing approximately 60 tons. Because the construction inspection neglected the influence of the adhesive force of the component and the tire mold and the vacuum adsorption force, the lifting beam cracking occurred in the frame beam. In this paper, based on the analysis of the causes of cracks in fabricated reinforced concrete structures, measures such as the location of reasonable lifting points and the reduction of the adsorption force are proposed, and the prestressed composite structure reinforcement scheme for the third phase of the expansion project of Qingzhen Power Plant is analyzed. .