1 概述采油十厂松花江水源工程,是大庆石油管理局重点工程,其松花江护岸工程采用沉井固脚,预制混凝土板护坡型式.受江水汛期影响很大,工期紧,为提高沉井混凝土强度,加快模板周转,确定汛前必须施工完,决定采用水泥裹砂混凝土新工艺,此项新工艺是近年来国内推出的一种混凝土搅拌新工艺,主要特点是分次投料,在不增加水泥用量的情况下,通过改变投料顺序,提高拌合质量,先加入砂子、河卵石及70%的水,搅拌均匀后,再加入水泥搅拌,使水泥颗粒充分分散而包裹在砂粒表面,可明显的改善混凝土内部的结构和各种性能,我处在松花江水源护岸工程首次应用了该项混凝土新工艺,取得了较好的经济效益和社会效益.
1 Overview Oil Plant 10 Songhua River Water Source Project is a key project of Daqing Petroleum Administration, and its Songhua River revetment project uses caisson solid feet and prefabricated concrete slab slope protection type, which is greatly affected by river flood season and has tight construction period. In order to improve caisson concrete Strength, speed up the template turnover, determine the construction must be completed before the flood, decided to adopt the new cement-wrapped concrete technology, the new technology is introduced in recent years, a new concrete mixing process, the main features are graded feeding, without increasing the cement In the case of dosage, by changing the feeding order and improving the mixing quality, first add sand, pebbles and 70% water, stir, then add cement mixing, the cement particles are fully dispersed and wrapped in the sand surface, which can be obvious Improve the internal structure of concrete and various properties, I was the first time in the Songhua River water revetment project applied the new concrete technology, and achieved good economic and social benefits.