论文部分内容阅读
新街矿区铁路专用线的修建将使蒙西地区的煤运通道连通成网,与区域路网协调统一,优化运输组织,提高运输效率。以地质、技术和经济条件等作为新街矿区铁路专用线线位方案研究比选的主要依据,对研究年度内该线的年度货运量进行预测,据此提出线路技术标准及运输组织方案,对新街矿区西侧方案、穿新街矿区方案和新街矿区东侧方案进行分析比较,提出推荐方案。
The construction of the special railway line in Xinjie mining area will connect the coal transportation corridors in Mengxi area into a network and coordinate with the regional road networks to optimize the transport organization and improve the transportation efficiency. Taking the geological, technological and economic conditions as the main basis for the comparison and selection of the railway line scheme of Xinjie mining area, the annual cargo volume of this line is predicted in the research year, and the line technical standards and transportation organization plan are put forward. West side of the mining area program, wear new street mining program and Xinjie mining east of the program analysis and comparison, put forward the recommended program.