17年来,三峡工程始终在等待“175”的到来,渴望进入正常运行期。但如今已是第二次受阻。蓄水与干旱的纠结谁与评说?2009年这次蓄水,起始蓄水位为145米,当时入库流量23500立方米/秒。此次蓄水方案较去年详细,规定9月底三峡水库水位原则上不高于158米,10月末蓄水至175米。若10月底水库水位
For 17 years, the Three Gorges Project has been waiting for the arrival of “175” and is eager to enter normal operation. But now it is the second time blocked. Who is talking about the tangles between water storage and drought? In 2009, the initial water level was 145 meters and the inflow was 23,500 cubic meters per second. The water storage plan is more detailed than last year, which stipulated that the water level of the Three Gorges Reservoir should not exceed 158 meters in principle by the end of September and should be charged to 175 meters by the end of October. If the end of October reservoir water level