论文部分内容阅读
1984年某城郊小学经上报批准在与某中学相邻的一边修建了一道栏栅围墙,一端与原围墙相接,另一端与中、小学后的山坡相连。1989年,该中学未办理报建手续,即在后建的围墙靠山坡的一端建成一间与围墙相连,高二点二米、面积四平方米的住校教职工洗澡房。该房背靠中学后操场的挡土墙,房顶与操场地面齐平。1991年,小学劈后山建操场。在施工期间,小学领导及老师一再教育学生不要在施工现场玩耍,并印发通知要求家长配合学校不要让学生提前到
In 1984, an outskirts primary school approved the construction of a fencing fence on the side adjacent to a middle school, one end connected to the original wall and the other end connected to the hillside behind the primary and secondary schools. In 1989, the high school did not go through the formalities of newspaper building, that is, a wall of the school faculty bathroom that was connected to the wall and had a height of 2.2 meters and an area of four square meters was built at one end of the fence built on the back wall. The back of the room behind the playground after high school retaining wall, roof and playground ground level. In 1991, elementary school split hill built playground. During the construction period, primary school leaders and teachers repeatedly educated students not to play at the construction site and issued a notice requiring parents to cooperate with schools so as not to allow students to advance to