潍坊电厂一期工程是全国第一批火电建设优化试点项目之一,也是全国优化项目中第一个全面投产的工程。该工程1991年5月1日正式开工,1994年两台机组全面竣工,投入商业运营。两台机组建设工期快、质量好,投产后都实现了稳发满发。~#1机试生产后第一年运行时数和发电量分别达到6830小时和18.41亿千瓦时,~#2机投运后第一年(试生产后尚不足一年)的运行时数和发电量分别达到了7696小时
The first-phase project of Weifang Power Plant is one of the first batch of thermal power construction optimization pilot projects in the country, and it is also the first project to be put into full operation in the national optimization project. The project was formally started on May 1, 1991. In 1994, the two units were fully completed and put into commercial operation. The two units have a fast construction period and good quality. After the production, they have achieved steady and full performance. The number of hours of operation and production of the first year after the trial production of ~#1 machine reached 6830 hours and 1.841 billion kwh, respectively, and the number of hours of operation of the first year after the commissioning of the #2 machine (less than one year after trial production). Power generation reached 7,696 hours respectively