论文部分内容阅读
根据神舟六号栽人航天飞行任务技术要求,在总结着陆场执行历次飞行任务经验的基础上,对着陆场系统总体技术方案进行优化设计,其正确性和可行性得以工程验证。
According to the technical requirements of the Shenzhou VI astronaut mission, based on the experience of carrying out previous missions of the landing site, the overall technical solution of the landing site system was optimized and the correctness and feasibility of the project were validated.