带硬时间窗的第四方物流多到多网络设计

来源 :控制工程 | 被引量 : 0次 | 上传用户:liangpask
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在第四方物流(4PL)承担多个供需点对之间物流配送任务情况下,考虑物流配送的时效性,研究带硬时间窗的4PL 多到多网络设计问题.建立了4PL 多到多网络设计优化模型,在满足硬时间窗约束的条件下,最小化总物流成本.根据问题模型特点,设计迭代局部搜索(ILS)算法求解.最后,通过仿真实验对不同规模的算例求解来测试ILS 算法的性能,并分析不同时间窗对决策的影响.实验结果表明模型具有合理性,并且ILS 算法能够对问题进行有效求解.“,”In the situation that 4PL takes the logistics distribution tasks between many supply-demand pairs, with the timeliness of logistics distribution considered, the problem of fourth party logistics (4PL) many-to-many network design with hard time window is studied. An optimization model of 4PL many-to-many network design is formulated, which minimizes the total logistics costs, subjective to the constraint of hard time window. According to the characteristic of the model of the problem, an iterated local search (ILS) algorithm is developed to solve it. Finally, several simulation experiments for the instances of different sizes are executed to test the effectiveness of the ILS algorithm, and then the effect of different time windows to decision is analyzed. The results of the experiments indicate that the model is suitable and ILS algorithm can solve the problem effectively.
其他文献
期刊
为了研究湖南省水库超蓄和库区淹没损失,通过湖南省湘、资、沅、澧的几座大型水库1993、1998年的防洪调度情况分析,对水库超蓄的巨大防洪作用和库区淹没损失及其两者的权衡关
针对一类在有限时间区间上重复运动的线性广义系统,提出了一种在固定初始学习状态下的闭环PD 型迭代学习控制算法,给出了该算法的收敛条件,并在理论上对算法进行了收敛性分析
志愿者计算模型由于可以高效的聚集和利用在Internet上闲散的大规模计算资源,使得人们对高性能计算的研究与实现比集群系统更加廉价和容易,近年来已在工程和科学计算中显示其
我国公共事业建筑之一就是医院,而且也是其中消耗最大的.医院改造工程的前期组织与实施管理是非常重要的工作,需要给予更多的关注.对医院改造工程的基本特点进行分析,并且将
针对当前列车节能控制智能优化研究中广泛采用遗传算法,但存在算子多、收敛速度不快的问题,采用粒子群算法结合罚函数法思想进行研究。通过对列车运行过程及列车牵引、巡航、
在我国社会经济的不断发展下,小城镇作为带动农村经济发展的基本载体,其建设规模和建设速度也快速增加.在建设和规划过程中,由于不重视环境问题,导致环境污染严重、耕地数量
农业部在重庆举办全国兽药管理法规政策培训班,对31个省级兽药行政管理人员进行兽药监管重点、兽药产品批准文号技术审查要点、兽药生产许可证核发系统、抗菌药耐药性控制等
期刊
直线电机是非圆车削刀具进给系统的重要组成部分,设计的基于非圆车削的无模型自适应迭代学习控制方案具有使直线电机具备自我学习,改进其位置误差的能力.首先给出了迭代域伪
2006年7月15日,经美国总统布什签署的《萨班斯-奥克斯利法案》正式生效。根据这一法案,在美国上市的海外公司及美国本土的中小型公司,其向美国证监会提交的财务报告必须真实