论文部分内容阅读
一个仅有400名职工的常州电力机械厂,“八五”期间年均以27%的递增速度发展。1995年在全国99家电力修造企业综合经济指标排行中,名列第10位;1996年出口排行首位;在江苏省电力系统中,首家获得核级产品生产许可证;今年上半年,产销率始终保持100%,胜利实现时间过半,完?
A Changzhou Electric Power Machinery Plant with only 400 employees developed at an annual rate of 27% during the “Eighth Five-Year Plan” period. Ranked the 10th in the list of 99 comprehensive economic indicators for power construction companies in 1995; ranked first in exports in 1996; the first to obtain nuclear grade production licenses in the Jiangsu power system; Keep 100% at all times. Half of the victory is achieved.