1500MW的纳特帕·伊哈克里工程是印度目前在建的最大水电工程。它遇到一些岩土工程方面的难题,其中包括引水隧洞及其施工支洞开挖遇到的高温水问题。论述了施工现场对该问题的处理、与之相关的隧洞衬砌设计,以及当隧洞最终充水时将采取的特殊防护措施。
The 1500MW Nutepa Ihakri project is the largest hydropower project currently under construction in India. It encountered some geotechnical problems, including high temperature water problems encountered in excavation of diversion tunnels and construction branch holes. Discusses the treatment of the problem at the construction site, the related tunnel lining design and the special protection measures to be taken when the tunnel is finally filled with water.