为缩短工程时间,尽快创造效益,某厂高炉扩容大修工程采取高炉在线生产、异地新建和推移原地的策略,并对高炉大修前期在线生产控制系统进行了研发。某厂高炉扩容大修整体工程,为了满足原高炉的正常生产,部分需要提前施工的工程只能利用高炉定休的间隙逐步完成,要求前期实施的工程既要保障原高炉的正常生产,又要保证大修后高炉能够正常应用,技术难度较大。
In order to shorten the project time and create benefits as soon as possible, the blast furnace expansion and overhaul project of a certain factory adopted the on-line blast furnace production and the strategy of new construction and relocation in different places. The on-line production control system for blast furnace overhaul was developed. In order to meet the normal blast furnace production, some of the projects that need to be constructed ahead of schedule can only be gradually completed through the gap of the fixed-time blast furnace. It is required that the project implemented in the early stage not only ensure the normal production of the original blast furnace, but also ensure overhaul After the blast furnace to normal application, technical difficulty.