论文部分内容阅读
“三北”开发、“三华”消纳、以特高压跨区输电和“三华”特高压同步电网建设为重点的坚强智能电网,是解决我国大规模风电开发和并网消纳难问题的“牛鼻子”。在即将过去的2013年,风电弃风、分布式发电、第三次工业革命等成为人们热议的话题,分布式发电、微电网被提到了前所未有的高度,人们对能源消费与供应革命寄予厚望。有人认为分布式能源利用将成为未来能源发展的主流,甚至怀疑大电网发展的必要性,果真如此吗?那么,风电弃风问题为何至今仍没有根本性的好转?其解决的出路又在哪里?未能同步搭建市场消纳平台是风电弃风问题的根源对于风电弃风问题的分析,必须立足系统全局的思路。风电接入电网相对简单,但
“Three North ” development, “Sanhua ” Consumption, strong UHV power grid with UHV transcontinental transmission and “Sanhua ” UHV synchronous power grid construction as the focus, is to solve China’s large-scale wind power development and Gets difficult to solve the problem of “cow nose”. In the forthcoming 2013, the wind farm, distributed generation, the third industrial revolution has become a hot topic, distributed generation, micro-grid was mentioned at an unprecedented height, people have high hopes for energy consumption and supply revolution . Some people think that the use of distributed energy will become the mainstream of future energy development, and even doubts the need for the development of large power grids. If so, why the problem of windward abandonment is still not fundamentally improved? Where is the solution? Failed to synchronously build a platform for market acceptance of wind power is the root cause of wind farm Wind windward problem analysis, we must base ourselves on the overall system of ideas. Wind power access to the grid is relatively simple, however