丰城电厂4×300MW工程主循环水泵房下部结构为两个沉淀蓄水池,分为东西两个单元,建筑总体积52000m2,总容积26000m2钢筋混凝土体积26000m2,混凝土设计强度C25,要求防裂、防漏、防渗。我处参加了该工程的施工,采用了泵送粉煤灰混凝土施工新技术,速度快、质量好,现介绍如
The main structure of the 4×300MW project of Fengcheng Power Plant consists of two sedimentation reservoirs, which are divided into east and west units. The total building volume is 52,000m2, the total volume is 26000m2, the reinforced concrete volume is 26000m2, and the concrete design strength is C25. Leakproof, impervious. I participated in the construction of the project and adopted the new construction technology of pumped fly ash concrete. The speed is fast and the quality is good.