高炉下降管一次吊装工艺

来源 :冶金建筑 | 被引量 : 0次 | 上传用户:kkk0089
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
鞍钢七号高炉的改建是在边拆除、边设计、边安装的情况下,多单位交叉立体施工中进行的,如果每个单项工程不能相互衔接,势必影响下一道工序的顺利进行。下降管的安装如果不能按期完成,则将影响管内衬耐火砖的砌筑,同时也影响高炉区域煤气管道的联合试漏。在这样的特定条件之下, The reconstruction of No. 7 BF at Anshan Iron and Steel Company was carried out in the case of dismantling, side designing, and side mounting in multi-unit intersecting three-dimensional construction. If each individual project cannot be connected with each other, it will inevitably affect the smooth progress of the next process. If the installation of the descending pipe cannot be completed on time, it will affect the masonry of the lined refractory bricks, and also affect the joint leakage of gas pipes in the blast furnace area. Under such specific conditions,
其他文献
测定了不同植被恢复类型[包括撂荒地、沙棘灌木林、华北落叶松人工林和混交林(主要由华北落叶松、白桦和山杨组成)]土壤有机碳、总氮、硝态氮、铵态氮及与氮代谢有关的土壤微
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
目前使用的立式吊罐其缺点是只能直接开启斗门,不能控制卸料流量,因而只能作为混凝土的运输容器,除了用于大体积混凝土浇灌外,对于小断面构件以及民用建筑中几乎没有多大使
我厂旧喷砂机只有一个喷枪,全用手工操作。于 活时,两只手戴上胶皮手套伸进操作孔,一手持喷枪, 一手抓喷件。工作效率低,劳动强度大。尤其是,由 于没有密封除尘设备,从旧喷砂
本文简要介绍了天津滨海新区盐碱地绿化常用技术,提出了盐碱地进行大面积绿化应采用以生物治理为主的综合治理新方法。并以塘沽滨海森林公园的建设为例详细阐述适合于滨海盐
150米~3×20米钢丝网水泥倒锥壳水塔(不防寒)是一种轻质高强的新型薄壳结构,它是由400号钢丝网水泥倒锥壳水柜(壁厚40毫米)和200号钢筋混凝土支筒(外径2.4米、壁厚0.18米)以
混凝土结构物的内部应力、包括从浇灌起整个硬化过程的测定,以前认为是不可能的。经过长期努力,能方便而准确地进行测定的“混凝土有效应力计”达到实用阶段。 The interna
四月六日至十一日,国家建委设计局、建筑学会、河北省建委和唐山市委在唐山市联合召开有192人参加的“唐山市民用建筑设计方案讨论会”。我校建工系在会上提出了唐山市小区
读过王栋生的“教育随笔”集《不跪着教书》,我强烈感到,这不仅仅是教书人应该读的书,而且是校长该读、教育干部该读、所有有小孩或关心下一代的人都该读的好书。也许是王栋
江西是一个农业大省,全省产粮地区辽阔,每年因收获期下雨或天气不佳而使谷物霉变量特别大。位于鄱阳湖平原的成新农场深有感触。在每年的10月份收割期经常阴雨绵绵,收割下来的稻谷