论文部分内容阅读
陆水电站装机容量为35,200(?),共装4台立式水轮发电机,单机容量为8,800(?)(10,350千伏安),功率因数0.85,本电站在中水年平均发电量为1.095亿度,利用小时数为3,180小时。本电站将于1960年投入生产运转,初期除供地方煤矿等工业用电外,大部分电力往武汉冶系统输送。随着地方工农业用电量的不断增长,电力将全部为地方工业所需。本电站由110千伏电压出线一(?)路,经咸宁乌龙泉联入武汉冶系统,35千伏电压出线四(?)路,向煤矿区、嘉鱼及崇阳送电。此外预留发电机电压出线四(?),供电站附近的煤矿等工业和蒲圻县用电。在方案比较中,会考虑的发电机电压6.3千伏的直配线、改由35千伏线路引出,在蒲圻近区建一降压变电站,经比较结果,增加投资3.97万元。年电能损耗38.6万度,为满足近区用电要求起见,因此仍以保留发电机电压出线较合理。本电站
With an installed capacity of 35,200 (?) And a total capacity of 4 vertical hydro-generators, the unit capacity is 8,800 (?) (10,350 kVA) and the power factor is 0.85. The average generating capacity of this hydropower plant in the hydropower year is 1.095 Billion degrees, the number of hours of use 3,180 hours. The power station will be put into operation in 1960, initially except for the local coal mines and other industrial electricity, the majority of electricity to Wuhan Metallurgical system. With the growing use of electricity by local industry and agriculture, electricity will all be required by local industry. The power station by the 110 kV voltage outlet (?) Road, the Xianning Wulongquan into Wuhan Metallurgical System, 35 kV voltage four (?) Road, to the coal mine, Jiayu and Chongyang transmission. In addition to reserve generator voltage outlet four (?), The coal mines and other industries near the power station and power consumption Puqian. In the program comparison, will consider the generator voltage 6.3 kV straight wiring, led by the 35-kilovolt line leads to build a buck substation in the vicinity of Pu Mian, the result of the comparison, an increase of 39,700 yuan investment. Annual energy loss of 386,000 degrees, in order to meet the near-zone power requirements, it is still more reasonable to retain the generator voltage outlet. The power station