通过完善项目变更的流程衔接实现成本控制

来源 :企业管理 | 被引量 : 0次 | 上传用户:studycomputer1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在市场经济不断变动和国有企业改革不断深入的大环境下,企业需要及时更新成本管理理念,做好成本控制。然而目前,我国工程建设项目的成本往往高于预期,很大一部分原因是由于项目变更。因此,完善项目变更的流程衔接对成本控制具有十分重要的意义。案例分析及问题阐述甲企业在发生项目变更时,有明确规定的手续。虽然已形成了一个基本流程,但严格来说仍存在一些漏洞。比如,项目部认为不属于设计变更或不涉及高昂费用的 Under the circumstance that the market economy is constantly changing and the reform of state-owned enterprises deepens, enterprises need to update the concept of cost management in time and make cost control. However, at present, the cost of construction projects in our country is often higher than expected, a large part of the reason is due to project changes. Therefore, it is very important for cost control to improve the process convergence of project changes. Case Analysis and Problem Description A enterprise in the event of project changes, there are clearly defined procedures. Although a basic process has taken shape, there are still some gaps, strictly speaking. For example, the project department does not think it is a design change or does not involve high costs
其他文献
每一个企业和企业家在成长过程中都伴随着种种的磨难,同时留下宝贵的经验教训,有些教训是非常值得大家分享的。
小企业对人才的吸引力严重不足,如果采用与大企业同样的选、用.育、留方法,无论如何也没法与大企业比拼。沧州捷瑞电子机箱有限公司独辟蹊径,创造了选“潜力股”、用“子弟兵”、
在人才市场上,企业与人才之间的界面是招聘经理,人才通过这个界面了解和认识一个企业,做出自己是否加盟的决策。招聘经理作为企业的"第一张名片",对企业能否选到优秀人才有着至
美国西部淘金热的时候,亚默尔放弃了找金子专门去找水。他找到了水源,然后把水包装起来卖给那些找金子的人。结果,他比找金子的人发财还快。新加坡餐饮店的老板竟然也不卖饭
2010年的最后一天,站在办公室的落地窗边,看着东二环上熙熙攘攘的车流.王志诚陷入沉思.下午,他和老板已经谈过.这将是他在公司的最后一天了.天色已晚.妻子打了好几次电话催他
走出自己的参考框架,进入客户的参考框架,发扬同理心,成为客户的“知音”;积累众多的解决方案,成为客户的“专家”;塑造形象,超值服务,赢得口碑,成为客户的“保姆”。