论文部分内容阅读
邯郸矿务局康城煤矿一坑主井、地面运输生产系统(下称康一系统),在一九七九年挖潜改造中,实现了自动程序控制。
Handan Mining Bureau Cancheng mine a pit of the main shaft, ground transportation production system (hereinafter referred to Kang system), in tapping the potential transformation in 1979, to achieve automatic program control.