论文部分内容阅读
本文以工铁厂2号冷矿筛分室地下室施工实践为例,叙述了建筑物底标高低于地下水位的工程施工方法。实践证明其措施是成功的。
This article takes the construction practice of the basement of No. 2 Cold Mine Screening Chamber in Gongtiechang Factory as an example to describe the engineering construction methods for the lower standard of the building below the groundwater level. Practice has proved that its measures are successful.