介绍了澳大利亚Penola浆厂的筹建情况以及浆厂的规划、构成和制浆工艺、制浆生产线的构成、产品特性、水处理的选择。Penola浆厂计划于2008年初开始现场施工,用24~30个月建成,2010年投入运行。Penola浆厂生产漂白化学热磨机械浆,设计能力为2200t(风干浆)/d。
The preparation and construction of the Penola pulp mill in Australia and the planning, composition and pulping of the pulp mill, composition of the pulp production line, product characteristics and water treatment options are introduced. The Penola mill is scheduled to begin construction on site in early 2008, completed in 24-30 months and put into operation in 2010. The Penola mill produces bleached chemical thermo mechanical pulp with a design capacity of 2200 t (air-dried pulp) / d.