论文部分内容阅读
杭钢2号高炉高强度冶炼前期炉况波动大,通过一系列的调整,找到了合理的煤气流分布,炉况达到了长周期稳定顺行。
In the early stage of high-intensity smelting of Hangzhou Iron and Steel (Group) No.2 blast furnace, the furnace condition fluctuated greatly. Through a series of adjustments, a reasonable gas flow distribution was found, and the furnace condition reached a long-term stable and smooth development.