国网上海市电力公司年度内基建、用户出资工程、检修技改工程结算审价工作与常规的工程造价结算审价专业性强、审核时间紧、集中审核工作量大等特性。审价过程中经常出现送审资料缺乏完整性、合同结算条款约定不清等问题,结合问题提出审价过程中的核重点,数据的有效性核对、计价方式的选定、新老文件的适用期限的确定等以满足结算价格的合法性、合规性、时效性。
During the year, State Grid Shanghai Electric Power Co., Ltd. paid special attention to infrastructure, user-funded projects, overhaul and repair engineering settlement audit work, and routine engineering cost settlement audit with high professionalism, tight examination time and centralized examination workload. In the course of the trial, there often appeared problems such as the lack of completeness of the materials submitted for trial, the unclear agreement of the terms of the contract settlement, the key points in the process of the trial in the light of the issues, the verification of the validity of the data, the selection of valuation methods, the applicable period of the new and old documents To determine the legality of the settlement price, compliance, timeliness.