Ground based, wind energy extraction systems have reached their maximum capability. The limitations of current de-signs are: wind instability, high cost of inst
IEC 61850 allows the replacement of conventional wire based systems to communication based system with local area network. Since new engineering processes are i
The solid propellant gas generators having high gas capacity are widely used for fast pressurization of elastic shells of saving devices of different applicatio
Theoretical investigation has shown a simple reaction water turbine would perform better when it spins faster. And for the simple reaction turbine water turbine
This paper presents a new approach via composite cost function to solve the unit commitment problem. The unit com-mitment problem involves determining the start