因地基承载力不足或支持不对称等因素引起主体结构不均匀沉降等结构病害是砖石结构古建筑保护的核心工作之一。采用手掘式顶管技术缓慢均匀地顶入预制的空心箱梁,随后浇筑芯梁,使之形成整体,从而使建筑物逐步的坐落在一个具有足够刚度的“托盘”之上,从而彻底地解决因地基承载力不足或支持不对称引起的结构病害。在介绍手掘式顶管技术在砖石结构古建筑基础托换的基础上,结合实际工程探讨了箱形截面梁设计、顶进工艺设计等关键性问题,提出有关建议和具体实施措施。
Due to inadequate bearing capacity or supporting asymmetry and other factors caused by the main structure of uneven settlement and other structural diseases is one of the core work of masonry ancient buildings protection. The use of hand-jacking pipe jacking slowly and evenly into the prefabricated hollow box girder, and then pouring the core beam to form a whole, so that the building is gradually located in a sufficiently rigid “tray ” above Thoroughly solve the structural diseases caused by inadequate foundation bearing capacity or supporting asymmetry. Based on the introduction of hand - under jacking technology in underpinning the ancient building foundation of masonry structure, the key problems of box girder design and heading technology design are discussed based on the actual project, and some suggestions and concrete measures are put forward.