1.工程概况崖羊山水电站位于云南省墨江哈尼族自治县与普洱哈尼族彝族自治县的界河李仙江上游把边江河段上,是李仙江干流河段规划七个梯级电站中的第一级。坝型为面板堆石坝,最大坝高88m,水库正常蓄水位835m,相应库容2.37亿m3,装机容量120MW。为了保证大坝的安全、稳定,有效地起到防渗作用,设计在坝前趾板及左右岸灌浆洞布设了固结和帷幕灌浆。面板堆石坝趾板轴线呈折线布置于坝轴线上游Ⅰ至
1. Project Overview The Yakushan Hydropower Station is located at the upper reaches of Li Xianjiang, the boundary of Mojiang Hani Autonomous County and Pu’er Hani and Yi Autonomous County in Yunnan Province. It is the first of the seven cascade hydropower stations planned for the main stream of Li Xianjiang. Dam type for the rockfill dam, the maximum dam height 88m, reservoir normal water level 835m, the corresponding storage 237 million m3, installed capacity of 120MW. In order to ensure the safety of the dam, play a role of seepage control steadily and effectively, the design of the consolidation and curtain grouting in the front plinth and the grouting holes on the left and right banks is designed. Panel rockfill dam toe axis line was arranged in the dam axis upstream Ⅰ to