论文部分内容阅读
防风工作是安全管理工作中不可忽略的一部分,两河口水电站现场施工地点所在地区的气象表显示:2~5月为大风高频发、风力最大时段,在施工过程中,采取必要的防风专项措施,是保障施工安全管理的必然要求。本文重点阐述了两河口水电站施工防风专项措施。
Wind protection work is a part of safety management that can not be ignored. The weather table in the area where the Lianghekou hydropower station is located shows that: from May to May, the wind is the strongest and the wind is at the maximum. During the construction, the necessary windbreak special measures are taken Ensuring Construction Safety Management Necessary Requirements. This article focuses on the windbreak special measures for construction of Lianghekou Hydropower Station.