论文部分内容阅读
巴西Pai Joaquin水电站装机容量为23.7 MW,设计人员遇到与净水头变化有关的挑战。最近,对正在安装的一台转桨式水轮机采取了一项创新的接力器设计。
At Pai Joaquin Hydropower Station in Brazil, which has an installed capacity of 23.7 MW, designers face the challenges associated with changing net head. Recently, an innovative relay design has been adopted for one of the paddle-mounted turbines being installed.