为了解决城市建设用地日趋紧张的状况,适应厦门特区四化建设发展的需要,经有关部门规划,厦门岛上最大的一条内陆港湾—筼筜港十平方公里的海滩地,今已开辟为特区工业建设的主要基地。筼筜港位于厦门市北的海滩地带,地势低洼,软基问题比较突出,天然地基强度无法满足上部结构物的变形要求。以往在地基设计上多采用桩基处理,造价很高,施工周期都较长。为简化基础处理,本文着重探讨
In order to solve the increasingly tense situation of urban construction land and adapt to the needs of the development of the four specializations in Xiamen Special Zone, the 10 square kilometers of beach area in Xiamen, the largest inland harbor on Xiamen Island, has been planned as the special zone. The main base for industrial construction. Da Nang is located on the beach in the north of Xiamen City. The terrain is low-lying, and the soft ground problem is quite prominent. The strength of the natural foundation cannot meet the deformation requirements of the superstructure. In the past, pile foundation treatment was often used in foundation design, which resulted in high construction costs and long construction periods. In order to simplify the basic processing, this article focuses on