论文部分内容阅读
分析该滑坡形成的工程建设原因和降雨诱因。并计算天然和暴雨工矿下的滑坡稳定性。结果表明天然工矿下,滑坡处于欠稳定状态,暴雨工矿下滑坡处于不稳定状态。并提出滑坡工程治理方案。
Analysis of the reasons for the formation of the landslide and rainfall incentives. And calculate the landslide stability under natural and stormy mines. The results show that under natural mining, the landslide is in an unstable state, and the landslide under heavy rainfall is in an unstable state. And proposed landslide project management plan.