一、前言我区自从1956年在吴川县引鉴工程板铺渡槽开始试用钢筋混凝土预制构件施工以来,经过几年的运用发展,在水利工程上已得到了进一步的推广。经验证明,预制构件的施工方法是优越的,它是今后水利建设发展的新方向。几年以来,我们在闸工方面采用装配式预制构件施工的规模较大的工程有:博茂分洪工程中的梅六分洪闸、电站、船闸及公路桥;黄竹美节制闸、电站、
I. Introduction In our district, since the construction of prefabricated reinforced concrete prefabricated members in the project boarding aqueduct project in Wuchuan County in 1956, after several years of development, we have got further promotion in water conservancy projects. Experience has shown that the construction method of prefabricated components is superior, which is the new direction for the development of water conservancy construction in the future. For the past few years, the large-scale projects that we have used prefabricated prefabricated components for sluice construction include the Meilufen Floodgate, Power Station, Ship Locks and Highway Bridges in the Bomao Flood Diversion Project, the Huangzhumei Governors Gate, the Power Station,