论文部分内容阅读
After the first concrete was poured on December 9,2012 at the Shidao Bay site in Rongcheng,Shandong Province,China,the construction of the reactor building for the world’s first high-temperature gascooled reactor pebble-bed module(HTR-PM)demonstration pow