大唐淮南洛河发电厂设计装机容量为4台30万千瓦燃煤汽轮发电机组, 分为两期建成,三期工程两台60万千瓦燃煤发电机组已于2005年5月18日正式通过国家核准,并于2005年9月8日举行了开工仪式,2007年第一台机组将投产发电。2001年4月至2002年8月,洛河电厂成功完成一期两台机组的整体技术改造。技改后的1#、2#机组经济效益、社会效益、环境效益显著提高,单机出力增至32万千瓦。至此,洛河发电厂总发电能力达124万千瓦,成为华东电网骨干发电厂。
Datang Huainan Luohe Power Plant designed capacity of 4 sets of 300,000 kilowatts coal-fired steam turbine generator set is divided into two phases completed, the three phase two 600,000 kilowatts coal-fired generating units on May 18, 2005 officially Passed the national approval, and held the groundbreaking ceremony on September 8, 2005. The first unit will be put into operation in 2007. April 2001 to August 2002, Luohe Power Plant successfully completed the first two units of the overall technological transformation. After the technical innovation, the economic benefits, social benefits and environmental benefits of Unit 1 and Unit 2 have been significantly improved, and the unit output has increased to 320,000 kilowatts. At this point, Luohe Power Plant total generating capacity of 1240000 kilowatts, becoming the backbone power plant in East China Power Grid.