论文部分内容阅读
运土自动滑行道一串装满了土的铁轱辘斗车被卷扬机从挖土坑拉到了一个陡坡上面,然后飞快的顺着另一个斜坡自动滑行到制坯车间的堆土场上,卸完土的空车又顺着第三条轨道自动滑行回到挖土坑.在这里再也看不到工人们吃力的挑着土、推着运土车一点一点往堆土场送土了,人们只是吹吹哨子、摇摇旗子、作一作转换道岔的工作,一车车的土就自动的送到了制坯车间.这就是东总屯砖瓦厂工人在大闹技术革命中创造的自动运土滑行道.在这个厂内,你和任何一个工人说起他们的滑行道来,他们都会眉飞色舞、喜气洋洋的向你介绍创造滑行道的经过和滑行道给他们全厂带来的好处.
Earth moving automatic taxiway A string of earth-filled iron 轱 wheelbarrow was hoist pulled from a digging pit to a steep slope above, and then quickly along the other slope automatically glide to the billet workshop dump soil field, unloading finished Earth empty car and along the third track automatically glide back to the digging pit here workers can no longer see the hard pick of the soil, pushing the soil to drive a little bit of soil to the dump site , People just blow whistle, shake the flag, make a work of converting turnouts, a car’s soil is automatically sent to the billet workshop.This is the East Tower brick factory workers in the technical revolution to create the automatic In this factory, you and any one worker talk about their taxiways, and they will all be enraptured, beaming to introduce you to the benefits of passing the taxiway and the taxiway to their entire factory.