论文部分内容阅读
京津风沙源治理工程已开展7年,并初显成效。工程区内生态环境明显改善,依托工程建设新兴生态旅游业、种植业、养殖业得到发展;农牧民收入不断增加,生活方式得到改善。工程建设成果主要是坚持综合治理、多管齐下,坚持机制创新多方参与;坚决治理与保护并举,生态与产业并重;坚持落实责任制、分工协作。目前,工程中存在:生态治理难、成果巩固难、后续产业难、资金保障难、综合评价难等问题。对加快工程建设提出了要保证工程建设连续性和稳定性,建立工程建设长效机制等政策建议。
Beijing and Tianjin sandstorm source control project has been carried out for 7 years, and the initial results. The ecological environment in the project area has been remarkably improved. With the construction of new ecotourism industry, the planting industry and aquaculture industry have been developed. The incomes of farmers and herdsmen have been continuously increased, and their lifestyle has been improved. The main achievements of the project construction are to adhere to the principle of comprehensive governance, take multi-pronged measures and adhere to the multi-factor participation of mechanism innovation. Both governance and protection should be adhered to equally and both ecology and industry should be adhered to. The responsibility system and division of labor and cooperation should be adhered to. At present, there are some problems in the project such as the difficulty of ecological management, the difficulty of consolidating the achievements, the difficulty of subsequent industries, the difficulty of securing funds and the difficulty of comprehensive evaluation. To speed up the construction put forward to ensure the continuity and stability of the construction, the establishment of long-term mechanism of construction and other policy recommendations.