龙羊峡水电站近坝库岸稳定性的研究和滑坡涌浪的预测、预报是本工程的重大技问题之一。我院从1979年开始会同有关科研单位和大专院校对本课题进行专题研究,于1984。年提出了“黄河龙羊峡水电站近坝库岸滑坡涌浪问题研究报告(运行期)”,1985年又提出了“黄河龙羊峡水电站蓄水初期近坝库岸滑坡监测没计专题报告”。这两个报告都经水电部原水电总局先后审查通过,1986年我院承担了本监测工程的土建、测量监测网、仪器安装等工作。我院组成了现场监测工程指挥部,组织了四个地勘队、测量队等六个单位的部分人员在工地会战。他们战胜了地形险恶、交通不便、生活困难等不利工作条件,终于在1986年10月上旬完成了首次监测的任务,为按期下闸蓄水提供了条件。
Longyangxia Hydropower Station near dam bank stability research and landslide wave forecasting and forecasting is one of the major technical problems of this project. Our hospital from 1979 began with the relevant research institutes and tertiary institutions to carry out thematic research on this topic, in 1984. Year proposed the “Yellow River Longyangxia Hydropower Station dam bank landslide near the wave of research report (operation period)” in 1985 and put forward “the Yellow River Longyangxia Hydropower Station reservoir near the reservoir bank landslide monitoring no special report” . Both of these reports were reviewed and approved by the former Ministry of Water and Electricity, and in 1986, our college undertook the civil works, surveying and monitoring networks and equipment installation of the monitoring project. Our hospital formed a site monitoring project headquarters, organized four geological prospecting team, measuring team and other six units of some personnel battle in the field. Overcoming unfavorable working conditions such as terrain danger, traffic inconvenience and difficult life, they finally completed the task of first monitoring in early October 1986, which provided the conditions for the floodgates to be shut down on schedule.