黑麋峰抽水蓄能电站检修排水系统设计充分考虑了抽水蓄能电站地下厂房埋深大的特点,采用直接排水方式;渗漏排水系统设置了油污水处理设备,保证厂房排出的渗漏水满足达标排放标准要求。本电站厂内排水系统在不满足直接自流排水的条件下,因地制宜,通过水泵抽排至厂房顶层排水廊道,然后直流排出厂外,简称为“半自流排水”方式,为后续多个不具备直接自流排水的抽水蓄能电站设计起到了很好的借鉴作用。
Black Moose Pumped Storage Power Station drainage system designed to take full account of the pumped storage power plant underground plant buried deep features, the use of direct drainage; leakage drainage system set up oil sewage treatment equipment to ensure leakage of plant effluent meet Meet the emission standards. The power plant drainage system in the plant does not meet the conditions of direct gravity drainage, according to local conditions, pumping to the plant through the drainage pump corridors, and then discharged to the factory DC, referred to as the “semi-gravity drainage” approach for the follow-up The design of pumped storage power station without direct gravity drainage plays a very good reference role.