Capacitive-load isolation technique[1] was proposed to improve the stability and capacitive load ability of the timing detector system in internal target of CSR
The demo injector is designed to accelerate proton beam to 25 MeV with beam current up to 10 mA.It includes a proton ECR ion source,LEBT,a 2.1 MeV room-temperat