嘉陵江全江渠化是我们西南地区第一条实施的全江渠化的一个伟大工程,是四川省和交通部联合策划第一条实施全江渠化的计划,是一个大手笔、大开发,是世纪性的开发。一、嘉陵江全江渠化的概念川江在自然状况下滩多水急,不利于船舶航行,水急落差大,虽有利于建设电站但不利于航行。渠化后,按规划将河流一级一级地筑坝既建电站又建船闸,把水位提高了并梯级衔接,水深了水面也宽了,全江就形成了一条畅通的水路通道。现在是滩多水急,只能走小船,渠化后原来滩多水急的山区河流嘉陵江,将变成
The Jialing River Quanjiang Canalization is a great project of the first implementation of Quanjiang canalization in southwest China. It is the first plan developed by Sichuan Province and the Ministry of Communications to plan the implementation of Quanjiang Canalization. It is a generous development with a century-long development. First, the concept of Jialing River Quanjiang River Chuanjiang under natural conditions more urgent, is not conducive to the ship sailing, rapid decline in water, although conducive to the construction of power stations but not conducive to navigation. After canalization, according to the plan, the river will be dammed at first-class level to build both the power station and the ship lock, the water level will be raised and the cascade will be connected, and the water surface will be wide. The whole river will form an unobstructed waterway. Now it is the beach more urgent, can only take the boat, after the canalization of the original river more Jialing River, mountainous rivers, will become