合肥第二钢铁厂位于合肥市东郊,是利用一九五八年大炼钢铁的基础,一九六五年进行重建,一九七○年建成投产的.至一九七九年统计,基建投资累计为九千八百万元,固定资产为六千九百万元,职工人数为三千九百一十四人.现有设备和生产能力:100立米高炉二座,设计能力年产铁十万吨;8吨氧气侧吹转炉三座,设计能力年产普钢十六万吨;“六一”型焦炉二座,设计能力年产焦二十万吨;18平米烧结机二台,设计能力年产烧结矿三十六万吨.据一九七八年统计,实际生产钢九点五八万吨、生铁七点七二万吨、焦炭十五点二三万吨、矽铁二千吨.该厂自一九七○年投产后,年年亏损,至一九七九年统计,累计亏损一亿二千六百万元.
Hefei No. 2 Iron & Steel Works is located in the eastern suburbs of Hefei City. It was built on the basis of steelmaking in 1958, rebuilt in 1965, completed and put into production in 1970. By 1979 statistics, infrastructure Total investment is 98 million yuan, fixed assets is 69 million yuan, and the number of workers is 3,914. Existing equipment and production capacity: 100 cubic meters of blast furnace, design capacity with an annual output of iron 100,000 tons; 8 tons of oxygen-side blowing converters; designed capacity to produce 160,000 tons of steel annually; two coke ovens of the “61” type with an annual output of 200,000 tons of coke; 18 square meters of sintering machines. With an annual capacity of 366,000 tons of sinter, the design capacity is based on the 1978 statistics. The actual production of steel is 95,800 tons, pig iron is 77,200 tons, coke is 152,300 tons, and iron 2,000 tons. Since the plant was put into production in 1970, it has been losing money every year. It has been counted in 1979 and has accumulated a total loss of 126 million yuan.