论文部分内容阅读
摘要:水利水电工程合同管理的重要性是不言而喻的,企业管理的方方面面都应围绕着这个核心内容来开展。在履行合同时,应该增强内部管理,加强自身素质,认真履行合同上所规定的各项责任和义务,尽量避免合同的终止和解除,给企业带来巨大损失。本文提出了水利水电工程合同管理中存在的缺陷,探讨了加强水利水电工程建设合同管理的改进对策。
关键词:水利水电;合同管理;缺陷;改进对策
Abstract: The importance of contract management of water conservancy and hydropower project is self-evident, all aspects of business management should be around this core content to carry out. In performance of the contract, should enhance internal management, and enhance their own quality, conscientiously fulfill the responsibilities and obligations of the contract, to avoid contract termination and release a huge loss to the enterprise.In this paper, the existence of the defect in the Contract Management of Water Resources and Hydropower Engineering, discussed improvements to strengthen water conservancy and hydropower project construction contract management countermeasures.Keywords: Water Resources and Hydropower; contract management; defects; Measures to Improve
中图分类号:TV文献标识码: A 文章编号:
为了确保工程质量,一些有经验的承包商会强化设计施工管理,加强对合同管理的力度,预测工程的变更索赔的风险,并针对相应的问题,制定出防范措施,从而将风险降低到最小。然而,我国很多水利工程承包企业的合同管理体系存在严重缺陷,造成项目效益从合同管理的缺陷中流失。
一、水利水电工程合同管理中存在的缺陷
1、合同双方缺乏沟通,不履行合同约定,在合同履行过程中,相关部门缺少沟通和函件往来,出现合同双方没有遵照合同约定履行自己的义务,材料使用,施工技术等不按合同规定进行,甚至出现非法的转包或分包情况,或将工程分包给不具有相关资质的单位,影响了水利工程质量,同时也使合同履行困难重重,给合同管理带来不必要的麻烦。
2、水电单位合同签订不规范。对风险的意识不强烈,部分水利单位对合同管理的重要性没有足够的认识.造成单位在对外签订合同时,仍存在大量不规范的问题。首先是合同本身不合法,出现主体不合格或存在违法条款等,实际上为无效合同,之后难免带来损失;其次有的单位签订合同不采用标准合同文本,用协议代替合同,合同文字不严谨,合同内容、形式有缺陷,造成合同条款漏洞百出,不够严密;然后部分单位没有制定严格的合同管理办法,合同印章管理也不规范,给合同管理埋下了很多隐患。
3、往往出现合同欺诈等违法行为,水利水电工程需要接触的承包商和材料供应商很多,发生的合同关系也多且复杂,主要发生的违法欺诈活动主要是虚构建筑工程预付款,骗取预付款和材料费,或者本来没有履约能力的单位通过弄虚作假,欺骗他人签订合同,或者是约定难以完成的条款,当对方违约之后再向其讨要违约金赚取额外收益等。这些合同欺诈手段给合同管理带来了许多困难,对整个工程都会造成严重的影响。
二、加强水利水电工程建设合同管理的改进对策
1、增强法律观念,依法进行合同管理。当前我国建设行业法律法规日趋完备,尤其是《招标投标法》、《合同法》等的颁布实施,对工程招标及合同管理提出了具体要求,水利系统也根据行业特点制定了有关政策、规范。各级水行政主管部门和水利水电工程参建各方要加强法律学习和法制宣传力度,促使全体员工增强法制观念,提高守法意识,学会用法律法规约束自己、保护自己,用法律武器维护单位合法权益,促进水利水电工程建设事业的健康发展。合同当事人在签订合同时应当认真阅读有关法律法规,并对所签合同的标的、计量标准、质量要求、价款支付方式、合同履行期限、地点、违约责任等等内容,应作出明确具体的解释,防止出现歧义,增强合同的严密性和可操作性。
2、强化合同管理意识,完善合同管理体制。遵循合同管理的法律程序,要从根本上改变那种靠行政手段管理水利水电工程建设的陈旧方法。由于合同本身的特征,决定了合同不同于单位内部的生產经营、人事、财务等管理工作,是一种受法律规范和调整的社会关系,涉及了大量的法律专业问题。因此,应建立专门的合同管理组织机构,例如设立法律事务部门或者设置法律顾问,来专门审核合同的签订和监督合同的履行。此外,也可以探讨建立单位计划、财务、质监等业务部门,以及纪检、监察、法律、审计等监督部门共同把关的合同会审制度,以期减少合同内容的盲目性。
3、加强学习培训,提高人员素质。在水利水电工程建设过程中,参建各方应选派具有丰富的工作实践经验、懂法律、懂管理、懂业务、懂财务、专业能力强、综合素质高并具有高度责任感和敬业精神的人员负责合同管理工作。对于合同管理人员要加强学习和培训,不断提高合同管理人员素质;对于其他管理人员和技术人员也要加强合同交底,使他们熟悉合同内容,做到有理、有据、有节的执行合同,变被动执行合同为自觉执行合同。
4、严格合同的预管理,坚持合同审查制度。所谓合同的预管理,就是合同签订前对合同项目的计划立项、招标文件的编制及审查等,这是合同签订后能否顺利实施的关键。招标文件的编制和审查要以技术要求合理,商务要求严谨、公平,整体规划可靠为原则。坚持合同审查制度,是合同能否顺利履行的前提与保证。水利水电工程建设合同审查的内容主要包括:建设项目是否具备合同签订的条件,合同内容是否符合法合规,合同条款是否详尽明确,工程等级和技术要求是否具体,是否符合国家规范标准,合同签定是否具有完备的手续。在工程招标时还应该对投标单位的主体资格、企业信誉、注册资金、隶属关系、财务经济状况、设备及技术条件、履约能力,与招标工程相类似的工程经验等进行严格审查,以确保中标单位的内在质量。
5、积极推广使用合同范本,签约之前广泛协商。使用水利水电工程建设合同范本有助于明确双方的权利与义务,防止合同缺项、漏项和不平等条款的出现,有关各方应积极推广使用。
每一份合同签订之前,合同管理部门对于合同文本要严格把关,必要时请有关业务职能部门进行会审。合同双方针对合同条款特别是主要条款进行全面、深入、详尽的平等协商,在签约阶段解决双方分歧问题,达成一致意见,才能减少合同履行的难度。
6、加强合同实施监督,及时全面履行合同。合同实施监督是合同管理的日常事务性工作。在合同执行过程中,主管部门及项目法人应定期检查合同履行情况,并建立完善的合同实施监督和检查考核制度。在履行合同过程中,严格按合同约定办事,对质量、进度、安全、造价、文明施工等管理要求,都遵从合同约定。合同双方是平等的合同主体,一切事务的处理都以合同为准绳。监理工程师和设计代表,以及其他参建单位,都在合同规范的范围内履行职责。对于设计变更和自然因素造成的费用增加,依据合同条款规定,本着公平公正的原则进行处理。对合同履行过程中出现的偏差问题,认真进行分析、纠正,对随意违反合同条款的行为要认真查处,通过正规化、规范化的合同管理防止因违规而造成不良后果。
参考文献:
[1] 工程合同管理与索赔案例分析(上)[J]. 中国招标. 2009(30)
[2] 工程合同管理与索赔案例分析(下)[J]. 中国招标. 2009(31)
[3] 黄祯台.水利水电工程建设合同管理[J]. 商品与质量. 2009(S2)
关键词:水利水电;合同管理;缺陷;改进对策
Abstract: The importance of contract management of water conservancy and hydropower project is self-evident, all aspects of business management should be around this core content to carry out. In performance of the contract, should enhance internal management, and enhance their own quality, conscientiously fulfill the responsibilities and obligations of the contract, to avoid contract termination and release a huge loss to the enterprise.In this paper, the existence of the defect in the Contract Management of Water Resources and Hydropower Engineering, discussed improvements to strengthen water conservancy and hydropower project construction contract management countermeasures.Keywords: Water Resources and Hydropower; contract management; defects; Measures to Improve
中图分类号:TV文献标识码: A 文章编号:
为了确保工程质量,一些有经验的承包商会强化设计施工管理,加强对合同管理的力度,预测工程的变更索赔的风险,并针对相应的问题,制定出防范措施,从而将风险降低到最小。然而,我国很多水利工程承包企业的合同管理体系存在严重缺陷,造成项目效益从合同管理的缺陷中流失。
一、水利水电工程合同管理中存在的缺陷
1、合同双方缺乏沟通,不履行合同约定,在合同履行过程中,相关部门缺少沟通和函件往来,出现合同双方没有遵照合同约定履行自己的义务,材料使用,施工技术等不按合同规定进行,甚至出现非法的转包或分包情况,或将工程分包给不具有相关资质的单位,影响了水利工程质量,同时也使合同履行困难重重,给合同管理带来不必要的麻烦。
2、水电单位合同签订不规范。对风险的意识不强烈,部分水利单位对合同管理的重要性没有足够的认识.造成单位在对外签订合同时,仍存在大量不规范的问题。首先是合同本身不合法,出现主体不合格或存在违法条款等,实际上为无效合同,之后难免带来损失;其次有的单位签订合同不采用标准合同文本,用协议代替合同,合同文字不严谨,合同内容、形式有缺陷,造成合同条款漏洞百出,不够严密;然后部分单位没有制定严格的合同管理办法,合同印章管理也不规范,给合同管理埋下了很多隐患。
3、往往出现合同欺诈等违法行为,水利水电工程需要接触的承包商和材料供应商很多,发生的合同关系也多且复杂,主要发生的违法欺诈活动主要是虚构建筑工程预付款,骗取预付款和材料费,或者本来没有履约能力的单位通过弄虚作假,欺骗他人签订合同,或者是约定难以完成的条款,当对方违约之后再向其讨要违约金赚取额外收益等。这些合同欺诈手段给合同管理带来了许多困难,对整个工程都会造成严重的影响。
二、加强水利水电工程建设合同管理的改进对策
1、增强法律观念,依法进行合同管理。当前我国建设行业法律法规日趋完备,尤其是《招标投标法》、《合同法》等的颁布实施,对工程招标及合同管理提出了具体要求,水利系统也根据行业特点制定了有关政策、规范。各级水行政主管部门和水利水电工程参建各方要加强法律学习和法制宣传力度,促使全体员工增强法制观念,提高守法意识,学会用法律法规约束自己、保护自己,用法律武器维护单位合法权益,促进水利水电工程建设事业的健康发展。合同当事人在签订合同时应当认真阅读有关法律法规,并对所签合同的标的、计量标准、质量要求、价款支付方式、合同履行期限、地点、违约责任等等内容,应作出明确具体的解释,防止出现歧义,增强合同的严密性和可操作性。
2、强化合同管理意识,完善合同管理体制。遵循合同管理的法律程序,要从根本上改变那种靠行政手段管理水利水电工程建设的陈旧方法。由于合同本身的特征,决定了合同不同于单位内部的生產经营、人事、财务等管理工作,是一种受法律规范和调整的社会关系,涉及了大量的法律专业问题。因此,应建立专门的合同管理组织机构,例如设立法律事务部门或者设置法律顾问,来专门审核合同的签订和监督合同的履行。此外,也可以探讨建立单位计划、财务、质监等业务部门,以及纪检、监察、法律、审计等监督部门共同把关的合同会审制度,以期减少合同内容的盲目性。
3、加强学习培训,提高人员素质。在水利水电工程建设过程中,参建各方应选派具有丰富的工作实践经验、懂法律、懂管理、懂业务、懂财务、专业能力强、综合素质高并具有高度责任感和敬业精神的人员负责合同管理工作。对于合同管理人员要加强学习和培训,不断提高合同管理人员素质;对于其他管理人员和技术人员也要加强合同交底,使他们熟悉合同内容,做到有理、有据、有节的执行合同,变被动执行合同为自觉执行合同。
4、严格合同的预管理,坚持合同审查制度。所谓合同的预管理,就是合同签订前对合同项目的计划立项、招标文件的编制及审查等,这是合同签订后能否顺利实施的关键。招标文件的编制和审查要以技术要求合理,商务要求严谨、公平,整体规划可靠为原则。坚持合同审查制度,是合同能否顺利履行的前提与保证。水利水电工程建设合同审查的内容主要包括:建设项目是否具备合同签订的条件,合同内容是否符合法合规,合同条款是否详尽明确,工程等级和技术要求是否具体,是否符合国家规范标准,合同签定是否具有完备的手续。在工程招标时还应该对投标单位的主体资格、企业信誉、注册资金、隶属关系、财务经济状况、设备及技术条件、履约能力,与招标工程相类似的工程经验等进行严格审查,以确保中标单位的内在质量。
5、积极推广使用合同范本,签约之前广泛协商。使用水利水电工程建设合同范本有助于明确双方的权利与义务,防止合同缺项、漏项和不平等条款的出现,有关各方应积极推广使用。
每一份合同签订之前,合同管理部门对于合同文本要严格把关,必要时请有关业务职能部门进行会审。合同双方针对合同条款特别是主要条款进行全面、深入、详尽的平等协商,在签约阶段解决双方分歧问题,达成一致意见,才能减少合同履行的难度。
6、加强合同实施监督,及时全面履行合同。合同实施监督是合同管理的日常事务性工作。在合同执行过程中,主管部门及项目法人应定期检查合同履行情况,并建立完善的合同实施监督和检查考核制度。在履行合同过程中,严格按合同约定办事,对质量、进度、安全、造价、文明施工等管理要求,都遵从合同约定。合同双方是平等的合同主体,一切事务的处理都以合同为准绳。监理工程师和设计代表,以及其他参建单位,都在合同规范的范围内履行职责。对于设计变更和自然因素造成的费用增加,依据合同条款规定,本着公平公正的原则进行处理。对合同履行过程中出现的偏差问题,认真进行分析、纠正,对随意违反合同条款的行为要认真查处,通过正规化、规范化的合同管理防止因违规而造成不良后果。
参考文献:
[1] 工程合同管理与索赔案例分析(上)[J]. 中国招标. 2009(30)
[2] 工程合同管理与索赔案例分析(下)[J]. 中国招标. 2009(31)
[3] 黄祯台.水利水电工程建设合同管理[J]. 商品与质量. 2009(S2)